Liaoning Dongdadongre Electricity Co.,Ltd
Address:Northeastern university in shenyang 128 mailbox
Postalcode:110004
Tel:13940365891
Phone:024-23991026 024-23995486
Fax:024-23913210
Website:sh-lanyun.com
E-mail:dddq@dddq.com
鸿运国际1, the length of the air curtain machine should be slightly longer than the width of the door, can use more than one connection to use.
2, the height of the door should be within the effective partition distance of air curtain machine, if the installation of the actual environment is different, for example, near the road or in the sand blown should choose the effective partition of hot air curtain machine distance is greater than the height of the door of the wind screen machine.
3, the height of the door is high, should choose as far as possible for the remote control type.
4, where the soot concentration of large, such as: kitchen, should choose the metal wind turbines wind curtain machine
鸿运国际Installation requirements:
鸿运国际The machine should be installed above the door frame.
鸿运国际Door width must be less than or equal to the captain of the air curtain degrees, if it was too wide and can be used to connect several typhoons screen machine installation.
Install base plate must be firmly fixed on the wall (or post), prevent due to loosening caused by vibration.
鸿运国际Installing a lift, are not allowed to mention the wind deflector when handle, so as to avoid wind deflector fall off or broken. The wind curtain machine
Installing a lift, by two people respectively in the metal base plate behind the wind curtain machine, to prevent the plastic shell due to uneven fracture.